[Iter-X] 7/100days
Note: This article was translated for me by AI. I wrote the original in Chinese. I never use AI to write my articles, because that would cost me my own expression; my freedom to express myself is always the most valuable part of my work. So if you can read Chinese, I recommend reading the Chinese version, where you will get the most original and unfiltered version. That said, technological progress exists to give us more convenience, so I will continue using AI to translate my writing into multiple languages, allowing valuable content to reach more people.
Day7️⃣
Today, I finished the design of the login-related pages and also made some adjustments to the fonts. I’m currently using the Alibaba PuHui font, which feels a bit more formal and neat. The previous cool “Xiao Wei” font was also quite good, with a bit of a non-conventional feel, similar to the theme. Later, I might consider allowing a switch between them.
Today, I pulled the MVP project and broke down a few tasks that are relatively clear and can be pushed forward. For now, I won’t assign tasks to specific people. Instead, I’ll let everyone freely pick the tasks they want to work on. Later, I’ll observe each person’s strengths and then coordinate tasks and personnel. The client-side team also did a great job setting up the framework, so we can start integrating with it gradually. I focused on the login-related tasks today to allow the client-side team to start integrating in phases.
Here’s a summary of the current situation:
- Prototype & UI/UX Design: 7%
- Backend (Go) Development: 10%
- Client-side (Flutter) Progress: 2%
If you think you meet the following criteria, feel free to reach out:
- Can persevere
- Have dreams
- Are interested
Enjoy Reading This Article?
Here are some more articles you might like to read next: